Welcome to our RV-10 Builder Site |
|
Cabin Heat Installation of the forward and rear cabin heat scat tubing was completed as the last event prior to closing up the tunnel. The fuel valve we installed required us to route the heater hose under the F-1048C bracket as opposed to above it. |
|
|