Baggage Area
This section is a hybrid of quick build and standard build
steps.
Framing of the baggage area proved to be a simple but
painstaking step. It does require close following of the instructions on
page 33-3.
We made a minor error in step 8 and accidentally used non-flush
blind rivets for the the first couple of rows against the far wall. Since
it is the baggage compartment and it will have carpet over the floor we decided to
leave those in place rather than drill them out all over again. It was a
lesson against complacency when there is a large mundane task of mindless rivet
pulling.
Its mentioned in the notes that we should think about running
cables and wire in this section. We didn't have any wires to run yet but elected
to run conduit down both sides to aid in pulling wires for avionics and other
support switches.
No other piece has been put in place and removed more than the Tailcone Forward Skin. We thought we might actually be able to
rivet it in place this time around...Not to be! We removed it
again and riveted in the nutplates required to secure the bulkheads in
place.
|